Standard Submittal RequirementsThroughout the entitlement process plans are submitted for review by village staff, its consultants and various review Boards. Following is a general schedule of the number of copies and types of prints required for various plan reviews. Since each project is unique, please use these lists as a general guideline for submitting documents. If you have any questions, contact the Community Development Department
for assistance.
Administrative Review• 4 copies
• Full size prints (Arch D / Arch E) folded to ± 9” x 12” • Colored renderings are acceptable in 11" x 17" format • Electronic submittals are accepted in PDF format Engineering Review• 2 copies (1 copy may be sent directly to the village's consulting engineer, Robinson Engineering)
• Full size prints (Arch D / Arch E)
Plan Commission / Zoning Board of Appeals• 20 printed copies of all required plans must be received at least 14 days prior to a scheduled meeting
• Changes appearing on submittal documents must be reviewed by Village staff prior to submission • Electronic versions (PDF format) of each document should be provided • All plans must be submitted on full size sheets unless arranged otherwise with the village
• Colored renderings are acceptable in 11" x 17" format
• Full size prints (Arch D / Arch E), folded to ± 9” x 12” • 11” x 17” prints, folded to 8.5” x 11” Village Board• 20 printed copies of all required plans must be received at least 10 days prior to a scheduled meeting
• Changes appearing on submittal documents must be reviewed by Village staff prior to submission • Electronic versions (PDF format) of each document should be provided • 3 of 20 copies must be provided on full size prints
• 17 of 20 copies must be provided on 11" x 17" prints
• Full size prints (Arch D / Arch E), folded to ± 9” x 12” • 11” x 17” prints, folded to 8.5” x 11” |